基于响应面法的煤巷掘进工作面顶板变形因素分析

Analysis of roof deformation factors in coal roadway heading face based on response surface method

  • 摘要: 为解决掘进工作面顶板稳定性影响因素多、空顶距取值不合理导致掘进速度慢的难题,基于响应面法通过数值模拟手段,研究煤巷掘进工作面顶板三向应力及变形规律,分析影响掘进工作面顶板变形的关键因素及其交互作用关系。研究结果表明:在掘进工作面前方约1倍洞径处应力调整及变形开始显现,至掘进工作面后方1倍洞径时应力调整基本稳定,在掘进工作面后方约2倍洞径时顶板变形基本稳定;顶板变形与顶板泥岩黏聚力和支护强度呈负相关关系,与顶板泥岩厚度及空顶距呈正相关关系,通过响应面法进行多因素交互分析是确定特定条件下掘进工作面合理空顶距的有效手段。根据赵庄煤矿33082巷地质条件,设置合理空顶距为2 m,支护强度提高至0.25 MPa,应用结果表明巷道稳定性得到保证,且巷道掘进速度也由原先的180 m/月提高至350 m/月,掘进速度显著提高。

     

    Abstract: The roof stability of heading face is affected by many factors and the driving speed is slow due to the unreasonable value of unsupported distance. In order to solve the problem, this paper studies the three-way stress and deformation law of coal roadway heading face roof based on response surface method through numerical simulation, and analyzes the key factors affecting the roof deformation of heading face and their interaction relationship. The results show that the stress adjustment and deformation begin to appear at about one time of hole diameter in front of the heading face, and the stress adjustment is basically stable at one time of hole diameter behind the heading face. The roof deformation is basically stable at about two times of hole diameter behind the heading face. Roof deformation is negatively correlated with roof mudstone cohesion and support strength, but positively correlated with roof mudstone thickness and unsupported distance. Multi-factor interaction analysis by response surface method is an effective means to determine the reasonable unsupported distance of heading face under specific conditions. According to the geological conditions of 33082 roadway in Zhaozhuang Coal Mine, the reasonable unsupported distance is set as 2 m, and the support strength is increased to 0.25 MPa. The application shows that the roadway stability is guaranteed, and the roadway driving speed is also increased from the original 180 m/month to 350 m/month, which significantly improves the driving speed.

     

/

返回文章
返回